On 13 March 2015 this roof along with many others was
ripped off but, now 5 months later its been put back on
Thanks to many people aboard and people here in Vanuatu
This is the Principle's house
he is smiling again
It takes a long time to plan all this work
getting funding ,getting workers,
getting materials ,getting fine days
but its all worth it to see smiling happy people
Not far to go now,the MMM building team leave next Saturday
after 3 weeks in Vanuatu
Great work guys
Rear of the Principle's house
ceilings going in
The veranda being repaired & strengthened
Here is the boys toilet block & shower room
The laser-light sheets are to be replaced on Mon/Tues
both sides of the building will needs repairing
all 6 sheets were smashed
3 Km away at Epule Technical school,
A new roof is being replaced by MMM
on the dinning hall
In the elephant grass are the 2 new Duplex houses .
with the rain & sun the grass grows "Very fast"
another picture of the Epule Dinning hall.
Here is the cookhouse for the cook at Epule
this is behind ,dinning hall
6 sheets of iron is needed to finish this project
for the MMM Team
We are now ready for the local communities to come and start the
floor slab
Here is the girls dormitory & shower block,
Their laser sheets were also broken on 15 March 2015.
these are going to be replaced before the MMM team leave
No comments:
Post a Comment