A truck loaded with loose bags of rice and
the men laying on top to hold them down
Yea right!
More seed potatoes to go to Tanna for planting
The last shower block at Onesua completed
The main block work on the Epule houses completed
only shower & toilets to finish
Ground breaking ceremony at Paonangisu for new
toilets to be built this month
all the materials for the building have arrived
for Rob and his men from Australia
including 1 Kiwi
I don't feel so bad about 3 different sizes of blocks we
received when I look at Rob's block that were delivered to him
Rob opening the container today at Paonangisu Village
No comments:
Post a Comment