The shutters are being painted
The toilet systems have been connected
The water is being installed into 1 of the Onesua duplex
The electrical students from Epule technical school are
doing the practical training under supervision
and installing the wiring for the buildings
The inside plumbing is also happening at Onesua duplex's
No comments:
Post a Comment