Pages

Friday, 27 May 2016


The shutters are being painted 


The toilet systems have been connected


The water is being installed into 1 of the Onesua duplex


The electrical students from Epule technical school are 
doing the practical training under supervision 
and installing the wiring for the buildings 



The inside plumbing is also happening at Onesua duplex's





No comments:

Post a Comment