Pages

Tuesday, 17 May 2016


Painting time for some of the men
with the container kitchen


The second container starting to take shape


More materials arriving at the PWMU project house 
the window shutter framing arrived today


Wilco hardware have dropped of some more material 
which will be used to build a shower & toilet block
at the PWMU Project house


A team from Hibiscus Coast will arrive in July to 
build the toilet/shower block


This is the hand washing tub 
where the clothes washing will be done 
using this wash tub


Blocks for the footing & floor 


The septic tank has been pumped out (Paul)


The sand & coral has arrive in time for the cement work to
start soon.


No comments:

Post a Comment