Pages

Sunday 6 September 2015


Saturday at Tekara Village



 The Dormitory is already to pour the floor


Gloria with Willy visiting from Ambrym


The two ton of cement arrived in time to pour the floor


also the cement arrived at Epule
but the prep work needs to be done on Monday/Tuesday 


Gloria ,Willy & Patterson(Willy Son)


One of Ship wrecks still littering the Port Vila shores
from cyclone PAM


No comments:

Post a Comment